More Details About The Steam Controller Assembly

By

A few days ago I received my own Steam Controller (because of limited availability I had to order it through another country to get my hands on it…) and just one day later Valve released a video of their assembly process of the said controller, apparently more or less fully automated. Most of you may have already seen the video, but I thought there are some interesting things to say about it beyond the simple contemplation.

First, the assembly takes place in Buffalo Grove, Illinois - a small city of 41 000 inhabitants. Fun fact, this is where the actor Vince Vaughn grew up. It’s pretty far from the headquarters of Valve (Bellevue, next to Seattle, which is very close to Redmond, also known as Microsoft-city).

Illinois

I am guessing that Valve either bought the space there in Illinois, or more likely manufactures it through/with a partner company based there - I could find several such companies in the area. Anyway, Valve claims it has designed the whole manufacturing process (again I’m not sure where the line is drawn between Valve and their partners, I am guessing they needed external engineers to help with the machine’s creation, you don’t develop that kind of knowledge/skills out of thin air). In terms of facility, it’s honestly not that large as you can see from the picture…

shot0009

But actually this picture is misleading since it only shows one part of the assembly. You can see later in the video another angle, and it’s very clear the assembly continues BEYOND the layout in the first pic.

shot0046

Another shot in the video displays a different angle as well from the other side of the facility:

shot0027

A closer look at the pictures reveal the actual supplier and potential designer of the machinery:

flexicell

Valve, instead of trying to get all the credit for yourselves, you could have mentioned your partner…

flexicellHP

Anyway.

The assembly apparently starts from the trackpads, which are already available on trays right from the start. This makes it easy for the robots to pick them up.

shot0004

The trackpads need to be attached to a little printed circuit, such as the following…

shot0005

This is actually what you see when you disassemble the Steam Controller: the flexible attachment between the main board and the trackpads:

trackpads2

A machine puts the brown circuitry together with the trackpad so that they are aligned properly and connected on the trackpad interface:

shot0012

And then the brown circuit is directly soldered on the trackpads by a robot.

shot0011

Next, it seems that they are directly doing the molding of the controller shell on site… the following pictures definitely look like moulds (look how their footprint is the exact opposite of the controller shell shape) - this is the back of the mould:

shot0013

And this is consistent with the fact that the mould are obviously made of metal (in order to be used and reused millions of times if needed) - and this is the front of the mould:

shot0017

And it seems very logical to see the controller shell positioned on that mould before being picked up by another robot - and by the way, it seems like the mould creates 4 controller shells at once. I think this may be why Valve can claim to have one of the longest, fully automated assembly lines: in my experience injection moulding is something that is usually done by a separate supplier in a different factory before being shipped for final assembly in a different location. Having that step included in the very same chain would be rather rare.

shot0016

The shell is then taken to a different place where another robot inserts one by one the coloured action buttons in the appropriate slots:

shot0019

The last piece for that side of the controller consists in the fixation of the button board at the back of the action buttons, to ensure they can be pressed. This little board is a very classical design used in controllers, to put pressure on specific points of the main board to trigger click events via switches.

shot0032

In the meantime, on another part of the assembly chain, the other side of the controller (the bottom shell with the main board) has already been assembled (the video does not show any of that), and the analogue pad is taken by another machine…

shot0021

… to be positioned on the said board. The analog pad mechanism is already there and the robot simply ensures the shell of the pad goes right on the little joystick, via a very elegant movement.

shot0023

You can see that at that particular stage, the shoulder buttons are already fixed on the main board - again that operation is not shown in Valve’s video.

shot0026

Then comes the final operation of the assembly, led by Aperture-labelled machines (a reference to Portal).

shot0031

This operation assembles both parts of the shell to form a single controller:

shot0033

The assembled controller is then tested for defects (I think), as two “fingers” come on the surface of each trackpad to ensure they are positioned correctly. If a defect is detected they would be rejected from the line before packaging.

shot0039

The same goes for the analog controller, tested for rotation:

shot0042

The controllers are then placed into a white plastic container and up they go to the packaging part of the chain. Note that many parts of the video are actually accelerated so it looks that things go really fast, when they actually don’t. The throughput seems to be something like one controller every 2 seconds or so, which would make something like a little less than 2000 controllers per hour of shift. It may sound like a lot, but it is really a very small production scale compared to usual consumer goods that can be produced in the hundreds of thousands of units per shift.

shot0043

Another machine pushes flat cartons into their proper shape so that they can welcome the long-awaited controller.

shot0045

The last part of the chain has two main robots: the yellow arm on the right is fixing some of the inserts in the final carton box, coming from three different feeders (providing accessories and the manual) before the controller is positioned by other yellow arm in the middle of the picture. Finally, as the boxes go through the left, they are closed by another side decide putting the cover on top of the box.

packaging line

Controllers are then put into shipper cartons, and those are put together on palettes for final shipment. One thing that we don’t know is whether these palettes are shipped somewhere else for storage before they are shipped to their final customers… or simply stored near the assembly line and shipped from there.

Here’s the full video below.

If you know of any other detail concerning the assembly process, please let us know in the comments!